Load Requirements Form Logo
  • Load Sheet Form

    Contact Information & Load Information
  • Contact Information

    Project/Member, General Contractor, Electrical Contractor
  • Requested Voltage

  • Load Information

    HVAC, Motor Load, Lighting & Misc.
  •  
  •  
  •  
  • Electric Requirements

  • Hours of Operation:      to     
    Days of Operation:      to      
    Number of Electrical Meters Request:         and
    Service in AMPS:             
    Number of Conductors per Phase:       Wire Size:   Request Service Type:      

  • Motor/Equipment Loads

    40 HP/40 KW or Greater
  • The following information is required, for each device, to perform a Voltage Drop/Motor Start Analysis to determine whether the device can be started across the line or a Motor Starter must be used to limit the inrush current to the value specified by TVEC:

  • Voltage Drop/Motor Start Analysis must be completed before any Line Design is finalized and any cost is quoted to the Member/Consumer.

  • Clear
  •  - -
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  • Finalization

  • Clear
  •  - -
  • Should be Empty: